My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-11-25_GENERAL DOCUMENTS - P2013006
DRMS
>
Day Forward
>
General Documents
>
Prospect
>
P2013006
>
2014-11-25_GENERAL DOCUMENTS - P2013006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:55:36 PM
Creation date
12/12/2014 7:49:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2013006
IBM Index Class Name
General Documents
Doc Date
11/25/2014
Doc Name
Updated Reclamation Cost Packet
From
DRMS
To
Fortune Revenue Silver Mines
Permit Index Doc Type
General Correspondence
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> Task description: Cost update <br /> Site: Revenue Mine Permit Action: 2014 Review Permit/Job#: P2013006 <br /> PROJECT IDENTIFICATION <br /> Task#: OOA State: Colorado Abbreviation: None <br /> Date: 11/24/2014 County: Ouray Filename: P006-OOA <br /> ilser: _RCO <br /> Agency or organization name: DRMS <br /> TASK LIST (DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description _ Used Size Hours Cost <br /> O1 A Remove wooden debris DEMOLISH <br /> 1 1 3.00 $115.77 <br /> 02A Grade drill pads and replace topsoil LOADER 1 1.16 $92.00 <br /> 03A Revegetate drill pads REVEGE 1 6.00 $204.00 <br /> 04A Haul reclamation equipment to and from site MOBILIZE 1 7.14 $1,702.00 <br /> SUBTOTALS: 17.3 $2,114 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02% Total= $42.70 <br /> Performance bond: 1.05% Total= $22.20 <br /> Job superintendent: 0.00 hrs Total= $0.00 <br /> Profit: 10.00% Total= $211.40 <br /> TOTAL O&P= $276.30 <br /> CONTRACT AMOUNT(direct+O&P)= $2,390.30 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legaUrelated costs): 500.00 Total= 500.00 <br /> Engineering work and/or contract/bid preparation: 0.00% Total= $0.00 _ <br /> Reclamation management and/or administration: 5.00% $119.52 <br /> CONTINGENCY: 0.00 Total= $0.00 <br /> TOTAL INDIRECT COST= $895.82 <br /> TOTAL BOND AMOUNT(direct+indirect)= $3,009.82 <br /> k""Lq <br /> S, � <br />
The URL can be used to link to this page
Your browser does not support the video tag.