My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-12-10_REVISION - M2010080
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2010080
>
2014-12-10_REVISION - M2010080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:00:24 PM
Creation date
12/12/2014 7:49:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2010080
IBM Index Class Name
Revision
Doc Date
12/10/2014
Doc Name
Comments
From
DWR
To
DRMS
Type & Sequence
CN1
Email Name
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� V <br /> lO,p DEPARTMENT OF NATURAL RESOURCES <br /> IN 6 DIVISION OF WATER RESOURCES <br /> \ Y <br /> *k 3F. v� * John W.Hickenlooper <br /> 1 g 7 6 Governor <br /> Mike King <br /> Executive Director <br /> Dick Wolfe,P.E. <br /> Director/State Engineer <br /> Response to Reclamation Permit Conversion Application Consideration <br /> ATE: December 9, 2014 <br /> TO: Amy Eschberger, Environmental Protection Specialist <br /> CC: Division 2 Office; District 67 Water Commissioner RECEIVED <br /> FROM: Caleb Foy, E.LT. CRF ,/ <br /> RE: Friederichs Pit, File No. M-2010-080 <br /> DEC 10 2014 <br /> Operator: Riverside Aggregates UVISION OF RECLAMATION <br /> Contact: Rudy Torres, (719)336-7361 MININGANDSAFETy <br /> Sec. 18, Twp. 22S, Rng.47W, 6"' P.M., Prowers County <br /> CONDITIONS FOR APPROVAL <br /> ® The proposed operation does not anticipate exposing groundwater. Therefore,exposure of ground <br /> water must not occur during or after mining operations. If stormwater is contained on-site, it must <br /> infiltrate into the ground or be released to the natural stream system within 72 hours, or all work <br /> must cease until a substitute water supply plan, or augmentation plan approved by water court, is <br /> obtained. Reclamation plans must ensure water will not be retained onsite for more than 72 hours <br /> unless an augmentation plan approved by water court is obtained. <br /> ® Other: All water brought on site for mining needs shall be a legal supply of water provided by an <br /> appropriate supplier. <br /> 1060MMENTS: The local Water Commissioner, Becky Nichols, may be contacted at (719) 688-6711 or <br /> rebecca.nichols(@state.co.tis regarding legal supplies of water in the area. <br /> Office of the State Engineer <br /> 1313 Sherman Street,Suite 818•Denver,CO 80203•Phone:303-866-3581 •Fax:303-866-3589 <br /> http://water.state.co.us <br />
The URL can be used to link to this page
Your browser does not support the video tag.