Laserfiche WebLink
3.05.2 <br />Bowie Resources Limited <br />Bowie No. 2 Mine <br />Reclamation Cost Summary' <br />Direct Costs <br />Category Task# Task Description Cost <br />A. Earthwork - Backflling and Rough Grading 90 Grade railroad spur 38,704 <br />C. Earthwork - Waste/Tailings Pile Capping <br />and/or Cover Placement 94 Haul "footprints" of loadout area stockpiles to refuse area 5,556 <br />E. Earthwork -Ripping 34 Rip Coal Storage/LOadout Area 402 <br />G. Earthwork -Finish Grading 56 Final Grade Railroad Spur 1,443 <br />H. Earthwork -Stream Channel <br />Construction/Reconstruction 64 Irrigation Ditch Establishment 662 <br /> 65 Excavation/Grading at Storage/Loadout 32,850 <br />I. Earthwork -Drainage ConVOI System <br />Installation/Removal 75 Remove Coal Stockpile Pond 179 <br /> 77 Remove Train Loadout Pond 1,354 <br />J. Earthwork -Topsoil/Subsoil Replacement 8. <br />Special Handling 82 Redistribute Topsoil at truck dump station 617 <br />L. Drill Hole/Monitoring Well Installation and/or <br />. <br />Sealing 86c Seal Loadout Wells 4,271 <br />M. Revegetation and Reseeding 87c Revegetate Remaining Mine Site 39,437 <br />N. Structural Demolition & Removal 88 SVUCtural Demolition 2,216,934 <br />O. Mobilization/Demobilization 89a Reclamation 41,442 <br /> 89c Yearly Maintenance 2,362 <br />P. Miscellaneous Reclamation Costs all tasks at 50% of Division calculation 117,374 <br />Total Direct Costs 2,503,587 <br />Indirect Costs <br /> Public Liability Insurance 38.806 <br /> ConVactors Performance Bond 21,531 <br /> ConVactors Proft 250,359 <br /> Job Superingtendent 55,915 <br /> Subtotal 366,610 <br /> Total Construction ConVact Amount 2,870,197 <br />'Taken from the Divisions Estimate <br /> <br />