Laserfiche WebLink
09/03/2014 WED 15: 07 FAX 7194892268 Kirkland Construction 0003/004 <br /> RECEIVED <br /> OL I 152014 Page 2 of 3 <br /> DPOS,.,,4 JF ReCtAMAT10N, <br /> 110c Annual Report "FEEP4:7)RV) MA7P" RALS <br /> � <br /> Permittee Name: RBK Construction, Inc. Permit Number: M-1990-106 <br /> Operation Name: RBK Pit No. 30 County: Pueblo <br /> Annual Fee Due: $323.00 Anniversary Date: October 16, 2014 <br /> Permit Acreage: 9.90 Current Bond Amt: $14,530.00 <br /> According to C.R.S. 34-32.5-116 or 34-32-116, each year, on the anniversary date of the permit,an operator slialI submit <br /> the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land,required <br /> monitoring information,reclamation accomplished to date and during the preceding year, any new disturbance that is <br /> anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year,the <br /> dates for the beginning of active operations,and the date active operations ceased for the year. <br /> Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br /> inspection of the site. If while completing this report, you learn that your site is not in compliance with the rules and the <br /> act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br /> 1. Is the site identification sign posted in accordance with Rule 3.1.12(1). YES NO <br /> 2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). YES NO <br /> 3. Is the mine site in final reclamation(all material extraction and stockpile removal is complete)? YES NO <br /> If"YES,"please note time limits related to completion of reclamation, Rule 3.1.3. <br /> 4. What was the date of last excavation, processing or hauling activity at the mine? Au'q SSTa/� <br /> 5. Does the mine operate more than 180 days per year? YES NO <br /> If"NO", please review Rule 1.13 to assure that your mine is in compliance. <br /> 6. Has this mine been granted: a)approval of TEMPORARY CESSATION Status? YES NO <br /> b) approval for INTERMITTENT OPERATION? YES <br /> 7. Number of acres currently affected (mining+incomplete and or unreleased reclamation). <br /> 8. Number-of acres that were newly affected during the current report year. <br /> 9. Number of acres that were reclaimed during the current report year. <br /> 10. Estimated new acreage to be affected in the next report year. <br /> 11. Estimated acres to be reclaimed in the next report year. <br /> 12. Total acres in various stages of reclamation, since perinitted raining activities began: <br /> Total acres Total acres Total acres Total acres <br /> backfilled: seeded w/ w/topsoil mulched w/ <br /> v/J e approved mix: 62 014 replaced: /-IvNe approved mulch: <br /> Total acres Total acres Topsoil Mulch application <br /> graded: fertilized w/ replacement rate(tons/ac): <br /> apvd Fertilizer: , depth(in.): /V OP At P <br /> Seed Fertilizer Mulch <br /> application application application <br /> method: method: method: 0 N 00 <br />