My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-10-07_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2014-10-07_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:48:38 PM
Creation date
10/7/2014 10:43:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
10/7/2014
Doc Name
Letter and Application
From
J.E. Stover & Associates, Inc.
To
DRMS
Type & Sequence
TR94
Email Name
SLB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINE ENGINEERING <br />MINE RECLAMATION <br />October 1, 2014 <br />J. E. STOVER & ASSOCIATES, INC. <br />2352 NORTH 7T" STREEET, UNIT B <br />GRAND JUNCTION, COLORADO 81501 <br />PHONE: (970) 245 -4101, FAX: (970) 242 -7908 <br />CIVIL ENGINEERING <br />CONST. MANAGEMENT <br />RECEIVED <br />OCT 0 7 2014 <br />Susan Burgmaier DIVISION OF RECLAMATION <br />Division of Reclamation, Mining & Safety MINING AND SAFETY <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re: Bowie Resources, LLC, Bowie No. 2 Mine <br />Technical Revision #94, <br />Material Storage Area on Gob Pile #2 <br />Permit C- 1996 -083 <br />Dear Ms. Burgmaier: <br />Bowie Resources, LLC, (BRL), is in the process of excavating the coverfill material from the east side <br />of gob pile #3. A portion of the coverfill material will be hauled to gob pile #2 and placed on the <br />completed slopes to the extent possible. Coverfill that cannot be placed on completed slopes will be <br />placed in stockpile on the second bench of gob pile #2. On behalf of BRL, enclosed is an <br />application for a technical revision to allow the stockpiling of coverfill material on the second bench <br />of gob pile #2. <br />A stability study was performed to demonstrate the weight of the coverfill pile does not compromise <br />the overall stability of the gob pile. <br />Please feel free to contact me if you have any questions. <br />Sincerely, <br />Tamme Bishop, P.E. <br />Project Engineer <br />Revised Pages: <br />Volume IX: TOC, Pages 7, 18, 19 and October 1, 2014 Stability Evaluation <br />Cc: Bill Bear, Bowie Resources, LLC (electronically) <br />Paonia Public Library <br />Bureau of Land Management (electronically) <br />US Forest Service (electronically) <br />
The URL can be used to link to this page
Your browser does not support the video tag.