My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-09-29_REVISION - M1977493
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2014-09-29_REVISION - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2020 8:22:48 AM
Creation date
9/30/2014 12:39:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
Revision
Doc Date
9/29/2014
Doc Name
SDP Sludge Cell Raise Addendum
From
Climax Molybdenum
To
DRMS
Type & Sequence
TR20
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Climax Mol�bden um Climax Mine <br /> Highway 91 - Fremont Pass <br /> Climax, CO 8029 <br /> A Freeport-McMoRan Company Phone (719)86-77718 <br /> Fax(719) 486-2251 <br /> Sent by Certified Mail <br /> September 26,2014 RECEIVED <br /> Mr. Eric Scott <br /> ✓Environmental Protection Specialist <br /> Division of Reclamation,Mining and Safety SFP 2 9 2014 <br /> Department of Natural Resources <br /> 1313 Sherman St. Room 215 DIVISION OF RECLAMATION <br /> Denver,Colorado 80203 MINING AND SAFE7y <br /> RE: SDP Sludge Cell Raise Addendum to Technical Revision 20—Tenmile Tailing Storage Facility, <br /> Climax Mine,Permit No.N-J977-493 <br /> Dear Mr. Scott, <br /> This letter and attachments are an addendum to Technical Revision(TR)20-Tenmile Tailing Storage <br /> Facility Design, Stability and Operations and Mcnitoring Plans. The addendum provides information <br /> regarding an elevation raise of the sludge cell co tainment berm for the Sludge Densification Plant(SDP) <br /> located adjacent to the Tenmile Tailing Storage acility(TSF). <br /> The sludge cell is located within the footprint of he Tenmile TSF as shown on the attached drawing. The <br /> sludge'cell berm was raised in 2012 to separate tl ie sludge cell contents from the tailing that was being <br /> deposited in the TSF with the resumption of min g and milling activities at Climax. Climax intends to <br /> continue depositing tailing within the TSF in acc rdance with TR-20 and needs to increase the height of the <br /> berm another 7 feet from its current elevation. S ilar to the 2012 construction and as shown on the attached <br /> drawing,Climax will place tailing material to rai a the core of the berm and then place rip rap to prevent <br /> erosion of the slope. The best material for rip ra that is durable and accessible is rock from the North 40 <br /> Overburden Stockpile Facility(described in TR- 2). Climax will haul and place up to 5,000 cubic yards of <br /> this material along the outer face of the SDP berr.i. <br /> The North 40 material is nearly identical in chemical composition as the tailing that will be deposited around <br /> it. Also,all water from this area is contained and is either used in the milling process or is treated and <br /> discharged in accordance with CDPS permit CO 000248. <br /> Please accept this letter and attachments as an addendum to TR-20 for your files. Climax also will maintain <br /> this information with our copies of TR-20. <br /> Sincerely, <br /> 1 P-5114 <br /> Raymond Lazuk <br /> Environmental Manager <br /> attachments <br />
The URL can be used to link to this page
Your browser does not support the video tag.