Laserfiche WebLink
317 6 <br /> STATE OF <br /> COLO RADO <br /> Speer Update <br /> Rob Laird <RobL@asphaltspecialties.com> Mon, Sep 22, 2014 at 8:59 AM <br /> To: "O'Donnell - DNR, Tyler(tyler.odonnell@state.co.us)" <tyler.odonnelI@state.co.us> <br /> Hello Tyler: <br /> I want to update you on the conditions out at the Speer site with weed control and the groundwater situation: <br /> • 1 am scheduling the weed spraying for the two locations noted in our TR and that will be done in about a <br /> week. The timing is very good. <br /> • Not only has Levi Kirby's 3ft. deep sump been dry since about September 1st, but Lyle Gurley's' well vault <br /> across the street has been completely dry since about 9-8-2014. 1 confirmed that this morning. It is well below <br /> ground surface as well. <br /> • The monitoring wells are stabilized at 16.10 ft. SWL from the top of casing for MW3-AS on 9-19-2014. This <br /> has been the about the same since 9-2-2014. <br /> • MH-9 is at 13.75 ft. SWL below top of casing also on 9-19-2014. This has been about the same since 8-28- <br /> 2014. <br /> That is it for an update. I will be conferring with my people on how to complete the French Drain (Phase 1) here <br /> this week. Thank you. Rob <br /> Rob Laird, Resource Manager <br /> Asphalt Specialties Co., Inc. <br /> 10100 Dallas St., Henderson, CO 80640 <br /> Ph: 303.289.8555/Fax: 303.289.7707/Cell: 303.994.2015 <br /> O'Donnell - DNR, Tyler<tyler.odonnell@state.co.us> Mon, Sep 22, 2014 at 9:16 AM <br /> To: RobL@asphaltspecialties.com <br /> Your message <br /> To: O'Donnell - DNR, Tyler <br /> Subject: Speer Update <br /> Sent: 9/22/14, 8:59:04 AM MDT <br /> was read on 9/22/14, 9:16:30 AM MDT <br />