Laserfiche WebLink
RECEIVED <br />SEP 0 2 2014 <br />DIVISION OF RECLAK <br />FE PORT <br />Permittee Naine: C , E -- <br />Operation Name: Lyons Quarry <br />Annual Fee Due: $791.00 <br />Permit Acreage: 979.54 <br />112c Annual Report <br />Permit Number: <br />County: <br />Anniversary Date: <br />Current Bond Amt <br />M- 1977 -208 <br />Boulder <br />)tember 8, 2014 <br />826,000.00 <br />Page 2 of-3 <br />According to C.R.S. 34-32.5-116 or 34-32-116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). 'E NO <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). YES NO <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES NO <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? CVr�'� <br />5. Does the mine operate more than 180 days per year? YES NO <br />If "NO ", please review Rule L 13 to assure that your mine is in compliance. <br />6. I las this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />b) approval for INTERMITTENT OPERATION? <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation) <br />m�h�n <br />:--,731 H U %)re1 j = 3C °-! <br />8. Number of acres that were newly affected during the current report year. <br />YES NO <br />YES O <br />3 '/to . 3 <br />M <br />9. Number of acres that were reclaimed during the current report year. <br />(a' <br />10. Estimated new acreage to be affected in the next report year. <br />11. Estimated acres to be reclaimed in the next report year. <br />12. Total acres in various sta cs of reclamation, itted mining activities <br />be pan: <br />Total acres Total acres Total acres <br />backfilled: �) % seeded w/ w /topsoil <br />Total acres <br />Via' <br />Asinceenu <br />a roved mix: re Laced: <br />Total acres Total acres Topsoil <br />graded:"' fertilized <br />mul ched w/ <br />a roved mulch: <br />„ Mulch application <br />w/ replacement <br />rate (tons /ac): <br />apvd fertilizer: depth (in.): <br />Secd Vin' Il 0/4-Z -5) Fertilizer <br />application j �ro�clC:c�S <br />'�jrr�ct�C�S application <br />Mulch <br />method: (2O -ZZ +z method: <br />application I. <br />method: <br />