Laserfiche WebLink
��Ij <br />ACME <br />EMIKM Acme Brick Company <br />Robert Tibbetts <br />401 Prairie Hawk Drive <br />Castle Rock, CO 80109 <br />Monday, August 11, 2014 <br />Mr. Chris Rowe <br />Colorado Division of Reclamation, Mining & Safety <br />1313 Sherman St, Rm 215 <br />Denver, CO 80203 <br />Re: Stevens Clay Lease. M- 1996 -064, TR <br />Dear Chris Rowe: <br />In response to the inspection of this site on June 11, 2014 and the report by the DRMS <br />dated June 16, 2014 Acme Brick Company would like to request a technical revision for <br />items 1 (Backfilling & Grading) and item 2 ( Gen. Compliance With Mine Plan). <br />1. Backfilling & Grading — There are four stock piles approximately 8,800 yards of <br />overburden which will be used for reclamation in the clay pit. The material will be <br />placed with scrapers and a dozer beginning at the toe of the wall and continually <br />added during all mining operations. This reclamation can occur in conjunction with <br />the mining process. <br />2. Gen. Compliance With Mine Plan — Acme Brick Company is requesting that the <br />allowable disturbed area be increased from 10 acres to 20.8 acres. Much of the <br />disturbed area is utilized for clay stock piles and loading trucks. <br />Please see attached photographs of reclaim material and weed spraying. <br />We hope the above information and attached supporting documentation are sufficient for <br />compliance with the recent DRMS requests for this revision. If you have any questions, <br />please contact Robert Tibbetts (720- 244 - 4223), and I will be happy to assist the Division <br />with any additional desired information. <br />Sincerely, <br />Robert Tibbetts <br />Mining Supervisor ,,/A F d- R PT- 1 2--2-3 -) �1 <br />a-)b iwic�3 -i�r2s <br />?b <br />11 G! <br />n %r <br />jir` f <br />a-)b iwic�3 -i�r2s <br />