Laserfiche WebLink
RECEIVEU <br /> AUG U 6 2 U 14 Page 2 of 3 <br /> DIVISION OF RECLAt+AAT10N, <br /> 112c Annual Report (!aM 11rPOnMA WF P012 <br /> Permittee Name: Elam Construction, Inc. dba Permit Number: M-1987-064 <br /> Sandco,Inc. <br /> Operation Name: Dillon Ranch Pit County: La Plata <br /> Annual Fee Due: $791.00 Anniversary Date: August 27, 2014 <br /> Permit Acreage: 106.00 Current Bond Amt: $31,118.07 <br /> According to C.R.S. 34-32.5-116 or 34-32-116, each year, on the anniversary date of the permit, an operator shall submit <br /> the Annual Fee,an Annual Report and Map showing the extent of current disturbances to affected land,required <br /> monitoring information,reclamation accomplished to date and during the preceding year, any new disturbance that is <br /> anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year,the <br /> dates for the beginning of active operations,and the date active operations ceased for the year. <br /> Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br /> inspection of the site. If, while completing this report,you learn that your site is not in compliance with the rules and the <br /> act,it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br /> 1. Is the site identification sign posted in accordance with Rule 3.1.12(1). (� NO <br /> 2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). DES NO <br /> 3. Is the mine site in final reclamation(all material extraction and stockpile removal is complete)? YES (!O <br /> If"YES,"please note time limits related to completion of reclamation,Rule 3.1.3. <br /> 4. What was the date of last excavation,processing or hauling activity at the mine? <br /> 5. Does the mine operate more than 180 days per year? NO <br /> If"NO",please review Rule 1.13 to assure that your mine is in compliance. <br /> 6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? YES <br /> b)approval for INTERMITTENT OPERATION? YES 5N <br /> 7. Number of acres currently affected(mining+incomplete and or unreleased reclamation). &6; <br /> 8. Number of acres that were newly affected during the current report year. ✓'� <br /> 9. Number of acres that were reclaimed during the current report year. I <br /> 10. Estimated new acreage to be affected in the next report year. <br /> 11. Estimated acres to be reclaimed in the next report year. <br /> 12. Total acres in various stages of reclamation, since permitted n-fining activities began: <br /> Total acres Total acres Total acres Total acres <br /> backfilled: 02 seeded w/ w/topsoil I mulched w/ <br /> approved mix: replaced: approved mulch: <br /> Total acres Total acres , Topsoil Mulch application <br /> graded: fertilized w/ replacement / rate(tons/ac): <br /> apvd fertilizer: depth(in.): <br /> Seed I Fertilizer Mulch <br /> application application %1/ application <br /> method: method: �/ method: <br />