Laserfiche WebLink
2014-07-21 08:30 3038328106 3038328106 >> 303 823WEIVEDP 4/5 <br /> AUG U 12014 fags 2 of 3 <br /> DIVISION OF RECLAMATION, <br /> 110c Annual Report MI G ERALS <br /> REP0�2 MAP 1w <br /> Perr»i,ttee Name: Phillips Stone Company, P&n-dt Number: M-1981-075 <br /> Inc. <br /> Operation Name_ Phillips Stone Company County: Boulder <br /> Annual Pee_Due: $323.00 Anniversary Date: July 30,2014 <br /> Permit Acreage_ 9.90 Current Bond Amt: $6,010.00 j <br /> According to C.R.S. 34-32.5-116 or 34-32-116, each year,on the anniversary date of the permit,an operator shall submit <br /> the Annual Fee,an Annual Report and Map showing the extent of current disturbances to affected land,required <br /> monitoring information,reclamation accomplished to date and during the preceding year,any new disturbance that is <br /> anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year,the <br /> dates for the beginning of active operations,and the date active operations ceased for the year. <br /> information contained in this report will be reviewed by the Division upon receipt anti prior to the next compliance <br /> inspection of the site. If, while completing this report,you team that your site is not in compliance with the rules and the <br /> act,it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br /> 1. Is the site identification sign posted in accordance with Mule 3.1.12(1), ES NO <br /> 2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). YES NO <br /> 3. Is the mine site in final reclamation(all material extraction and stockpile removal is complete)`? YES <br /> If"YRS,"please note time limits related to completion of reclamation,Rule 3.1.3. <br /> 4. What was the date of last excavation,processing or hauling activity at the mine? <br /> 5. Does the mine operate more:than 180 days per year? (ig NO <br /> If"NO",please review Rule 1.13 to assure that your mine is in compliance. <br /> 6. Has this mine been granted: a.)approval of TEMPORARY CESSATION Status? YES NO <br /> b)approval for INTERMITTENT OPERATION? YES <br /> 7. Number of acres currently affected(mining t incomplete and or unreleased ruclamation). L Q <br /> K. Number of acres that were newly affected during the current report year. � b(o/Y&-- <br /> 9. Number of acres that were reclaimed during the current report year. <br /> 10. Estimated new acreage to be affected in the next report year. - <br /> 11. Estimated acres to be reclaimed in the next report year. <br /> 12. Total acres in various stages o f reclamation,since;permitted reining activities be an: <br /> otal acres Total acres Total acres Total acres <br /> backfilled: I seeded w/ whopsoiI mulched w/ <br /> approved mix:i <br /> replaced- a roved mulch:Total acres "futal acres Topsoil Mulch application <br /> graded: fertilized w/ replacement rate(tons/ac): <br /> a vd fertilizer: depth (in.): _ 1 <br /> Seed Fertilizer 1 I Mulch 1 <br /> Iapplication application application <br /> method: method: method: <br />