Laserfiche WebLink
7/31/2014 State.co.us Executive Branch Mail -RE: New Elk Mine, C1981012, TR68, Second adequacyre,�iew <br />kent @gorhamenergyconsultants.com <kent @gorhamenergyconsultants.com> Wed, Jul 30, 2014 at 4:05 PM <br />To: Ron Thompson <ront horn pson @newelkcoal.com >, "Simmons - DNR, Leigh" <leigh.simmons @state.co.us >, <br />Louis Head <Ihead @newelkcoal.com> <br />Cc: Alysha Hernandez - DNR <alysha.hernandez @state.co.us> <br />Ro n, <br />We'll mainly be talking about specific numbers related to topsoil balance and the cost estimate. I <br />think we can work through it based on what has already been submitted with only minor changes, <br />unless Leigh has additional information that I am not aware of. If we get stuck, I may want to <br />call you during the meeting for clarification or input but your presence for the entire meeting is <br />likely not necessary. I'll be in touch after the meeting, or during, should the need arise. <br />Thank you! <br />Kent Gorham <br />Gorham Energy Consultants, LLC <br />13356 Wild Basin Way <br />Broomfield CO 80020 <br />(303) 870 ®3787 (c) <br />(303) 465 ®1274 (h) <br />MEMOS <br />of <br />From: kent @gorhamenergyconsultants .com [ mailto :kent @gorhamenergyconsultants .com] <br />Sent: Monday, July 28, 2014 11:51 AM <br />To: Simmons - DNR, Leigh; Louis Head; Ron Thompson <br />Cc: Alysha Hernandez - DNR <br />Subject: RE: New Elk Mine, C1981012, TR68, Second adequacy review <br />https: / /mai l.g oog le.conVmai 1 /u /0 / ?ui =2 &i k=e29129fcb5 &view = pt &search =i nbox&th= 147894el8a90067e &si ml= 147894el8a90067e 1/3 <br />