Laserfiche WebLink
w O� COl \ DEPARTMENT OF NATURAL RESOURCES <br /> �Q� 9oi DIVISION OF WATER RESOURCES <br /> John W.Hickenlooper <br /> \ <br /> 1876 Governor 8 7 � <br /> f Mike King <br /> Executive Director <br /> Dick Wolfe,P.E. <br /> Director/State Engineer <br /> Response to Reclamation Permit Application Consideration <br /> DATE: July 28, 2014 RECEIVED <br /> TO: Bob Oswald, Environmental Protection Specialist <br /> CC: Division 3 Office; District 27 Water Commissioner JUI 2 8 ?;?14 <br /> FROM: Caleb Foy, E.I.T. CRC DWISION OF RECLAMATM <br /> _:_ <br /> RE: Crystal Hill Project, File No. M-2014-027 PINING ANp$q�iy <br /> Operator: Colorado Mining& Exploration, LLC <br /> Contact: Bob Gydeser <br /> Sec. 28, Twp. 43N, Rng. 6E,N.M.P.M., Saguache County <br /> CONDITIONS FOR APPROVAL <br /> ® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br /> water must not occur during or after mining operations. If stormwater is contained on-site, it must <br /> infiltrate into the ground or be released to the natural stream system within 72 hours, or all work <br /> must cease until a substitute water supply plan, or augmentation plan approved by water court, is <br /> obtained. Reclamation plans must ensure water will not be retained onsite for more than 72 hours <br /> unless an augmentation plan approved by water court is obtained. <br /> COMMENTS: According to the application, no water will be used in mining or screening of the ore. <br /> 17) <br /> ehCANNED <br /> Office of the State Engineer <br /> 1313 Sherman Street,Suite 818•Denver,CO 80203•Phone:303-866-3581 •Fax:303-866-3589 <br /> www.water.state.co.us <br />