My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-07-28_REVISION - M1977215 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977215
>
2014-07-28_REVISION - M1977215 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:13:14 PM
Creation date
7/30/2014 1:49:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977215
IBM Index Class Name
Revision
Doc Date
7/28/2014
Doc Name
Response
From
DWR
To
DRMS
Type & Sequence
AM2
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�F cam_ l_� DEPARTMENT OF NATURAL RESOURCES �/Wgz <br /> * , DIVISION OF WATER RESOURCES <br /> John W.Hickenlooper <br /> j <br /> 6 Governor <br /> _87 � <br /> Mike King <br /> Executive Director <br /> Dick Wolfe,P.E. <br /> Director/State Engineer <br /> Response to Reclamation Permit Amendment Application Consideration <br /> DATE: July 28, 2014 <br /> TO: Bob Oswald, Environmental Protection Specialist <br /> CC: Division 3 Office; District 20 Water Commissioner �V L <br /> FROM: Caleb Foy, E.I.T. C p�7 <br /> RE: Bulldog Mine Operation, File No. M-1977-215 DM&ONOr'?EC <br /> Operator: Rio Grande Silver, Inc. AMININGANp ���N <br /> Contact: Randy McClure,(719)658-1080 SAFEJY <br /> Sec. 35,Twp. 42N, Rng. 1 W,N.M.P.M., Mineral County <br /> CONDITIONS FOR APPROVAL <br /> ® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br /> water must not occur during or after mining operations. If stormwater is contained on-site, it must <br /> infiltrate into the ground or be released to the natural stream system within 72 hours,or all work <br /> must cease until a substitute water supply plan, or augmentation plan approved by water court, is <br /> obtained. Reclamation plans must ensure water will not be retained onsite for more than 72 hours <br /> unless an augmentation plan approved by water court is obtained. <br /> ® All ground water monitoring wells shall be constructed and/or used only after the proper <br /> notification/permitting through this agency. <br /> COMMENTS: Information regarding permitting of monitoring wells is available online at: <br /> http•//water.state.co.us/groundwater/wel 1perm it/Pages/Observation Ho les.aspx. <br /> SCANNED <br /> Office of the State Engineer <br /> 1313 Sherman Street,Suite 818•Denver,CO 80203•Phone:303-866-3581 •Fax:303-866-3589 <br /> www.water.state.co.us <br />
The URL can be used to link to this page
Your browser does not support the video tag.