Laserfiche WebLink
op >C -7Ag <br /> %3 k COLORADO DIVISION OF :h ECLAMATION9 MINING AMID SAFETY <br /> 1313 Sherman Street, Room 215,Denver,Colorado 80203 <br /> /-S <br /> RE QUESTFOR TECHNICAL REVISION R COVER SHEET <br /> 1�ile No.: l+,il- 1977-248 Site Name:JD-5 Mine <br /> County Montrose --_TRII <br /> — DRILIS Use only) <br /> Permittee: Gold Eagle Mining Inc. <br /> Operator(If 0thee than Pertnittee): Don Comm <br /> Pertnittee Represcntativc: NA <br /> Please provide a brief description of lie proposed revision: <br /> �A�Teecchhnical Revision (TR)is being sought to support Final Reclamation of the JD-5 Mine. <br /> current conditions. ' <br /> As der==by the Minerals Rules,a Technical Revision (TR) is:"a change in the permit or application <br /> which does,not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environme'ptal Protection Phin." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request t'or a TR is not considered "tiled for review"until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> pertnittee rgquests additional time, in writing,to provide the required information. <br /> '('here is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient in formation to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit'rype- Please mark the correct No and submit it with, <br /> your request for a Technical Revision. <br /> Permit Tvnc Required TR Fee Submitted(mark only one) <br /> 1 I0c, 111, 112 construction <br /> materials,and 112 quarries $216 <br /> 112 hard rock(not DIVIO) $175 I <br /> I I Od. 112d(1. 2 or 3) <br /> $1006 �✓ <br />