My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-12-09_REVISION - M1978311
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1978311
>
2013-12-09_REVISION - M1978311
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:12:58 PM
Creation date
7/1/2014 10:59:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978311
IBM Index Class Name
Revision
Doc Date
12/9/2013
Doc Name
TR Adequate Revision Approved
From
DRMS
To
Gold Eagle Mining, Inc.
Type & Sequence
TR3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION OF RECLAMATION,MINING AND SAFETY STATE OF COLORADO <br /> Department of Natural Resources <br /> 1313 Sherman St.,Room 215 <br /> Denver,Colorado 80203 C O L O R A D O <br /> Phone:(303)866-3567 D i VI s ION o r <br /> RECLAMATION <br /> FAX:(303)832-8106 MINING <br /> —cSt— <br /> SAFETY <br /> December 9,2013 cove oHicken;ooper <br /> Mike King <br /> Mr. Don Coram Executive Director <br /> old Eagle Mining,Inc. Loretta E P€neda <br /> P.O. Box 3007 D rector <br /> Montrose,CO 81401 <br /> Re: Hawkeye Mine,Permit M-1978-311,Technical Revision TR-03,Technical Revision Adequate, <br /> Revision Approved <br /> Dear Mr.Coram, <br /> The Division has reviewed the Technical Revision referenced above,including the adequacy response <br /> letter and annotated map received by the Division on December 6,2013. Review of the final materials <br /> shows that the requirements of the Division's Hard Rock and Metals Rule 3 and Rule 6.3 have been <br /> satisfied. <br /> Except for the completion date proposed in Gold Eagle's submittal,the revised reclamation plan,as set <br /> forth in Technical Revision TR-03, has been approved by the Division,effective as of December 6,2013. <br /> The specific details of the revised reclamation plan address current conditions for disturbances created <br /> after issuance of the pen-nit and are the basis of the Division's approval as discussed below. <br /> I. Portal. The revised reclamation plan proposes to leave the existing steel grate that is anchored <br /> and welded in place at the portal, with no adit backfilling required,as the permanent closure. The <br /> Division has received no adverse comment from the DOE,and the Division therefore approves <br /> this method of safeguarding the shaft. The steel grate fully covers all portions of the adit <br /> opening,it is securely welded to the imbedded anchors, and the surrounding sandstone face is <br /> intact and competent. <br /> 2. Steel ore bin. The revision proposes to leave the steel ore bin in place,due to its"historic value." <br /> The ore bin structure is stable and in good condition. The Division has received no comment <br /> from the DOE stating that the ore bin should be removed. The Division approves this part of the <br /> revised reclamation plan. <br /> 3. Wood cribbing. The operator has proposed cOpt the wood cribbing remain permanently onsite <br /> due to its claimed value as a"historic struetpo," The Division has not received comment from <br /> the DOE that this would be unacceptable,and the Division therefore is approving this revision to <br /> the reclamation plan. <br /> Page 1 <br /> Office of Office of <br /> �nrl Rorlamatinn Denver • Grand lunction • Duraneo Active and Inactive Mines <br />
The URL can be used to link to this page
Your browser does not support the video tag.