Laserfiche WebLink
f <br /> GAGLIANO ENGINEERING, INC. <br /> P.O.Box 2520 <br /> PUEBLO,CO 81004 <br /> PHONE: 719-547-7073 EMAIL:jvg @incasys.com <br /> April 14, 2014 <br /> Division of Reclamation, Mining & Safety <br /> 1313 Sherman Street, Room 215 <br /> Denver, CO 80203 <br /> RE: Technical Revision to 112c Permit No. M-2002-118 7 l z' <br /> Velarde Pit—APC Southern Construction Co.,LLC <br /> Gentlemen: <br /> As defined in Rule 1.1 —Definitions, this technical revision application represents a <br /> change which does not have more than a minor effect upon the Reclamation Plan for the <br /> existing Regular I I 2 Permit for this operation. <br /> The purpose of this technical revision is to increase the maximum disturbed area of land <br /> from 20 acres to 30 acres. Please refer to the attached revised annual report map for the <br /> details. The 30 acres disturbed area is currently being reclaimed. <br /> It is my understanding that the Operator has already increased the Financial Warranty per <br /> the Corrective Action letter dated Feb. 11, 2014. <br /> We have attached to required fee of $216.00 for processing of this Technical Revision <br /> request. Thank you for your time regarding this matter. Please contact us if any further <br /> information is needed. <br /> Cordially, P 4 <br /> Joseph . Gagliano <br /> Gagliano Engineering, Inc. <br /> Consultant and Agent for <br /> APC Southern Construction Co.,LLC <br /> �l AF& Report RECEIVED <br /> �1 No Violations <br /> APR 15 2014 <br />