Laserfiche WebLink
DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3567 <br />FAX: (303) 832 -8106 <br />STATE OF COLORADO <br />P/tj j'PIQ0 -0©1 e <br />COLORADO <br />DIVISION OF <br />RECLAMATION <br />MINING <br />SAFETY <br />April 14, 2014 <br />John W. Hickenlooper <br />Governor <br />Mr. Chad Linker <br />Mike King <br />Northern Colorado Constructors <br />Executive Director <br />9075 Weld County Road 10 <br />Loretta E. Pineda <br />Fort Lupton, CO 80621 <br />Director <br />Re: Perry Pit, Permit M -1990 -098, Succession of Operators Approval, Revision SO -1 <br />Dear Chad. Linker: <br />On April 14, 2014, the Division of Reclamation, Mining and Safety approved the succession of operators from Asphalt <br />Paving Company to Northern Colorado Constructors for this operation. Northern Colorado Constructors is now the <br />permitted operator of the Perry Pit, and as such, is responsible for all provisions in M -1990 -098, as well as those <br />specified in the Rules and Regulations. Asphalt Paving Company is relieved of all responsibilities concerning this <br />operation. <br />Please Note: <br />1. All of the application materials, as amended and supplemented, are in integral part of your permit. They have <br />been incorporated into the permit by reference. We presume that you have a copy of all of these materials; therefore, <br />none have been enclosed with this mailing. We suggest that you keep a copy of the permit and the permit application <br />at the mining operation as a reference for operation personnel, to help ensure compliance with the terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those described in the permit may require a <br />modification to the permit. We suggest consulting the Rules and Regulations and/or contacting us to determine if a <br />modification to the permit is necessary. Rule 1.10 pertains to Amendments, Rule 1.9 to Technical Revisions, and Rule <br />1.11 to Conversions. <br />3. On your permit anniversary date each year, you must submit an annual fee and annual report to us. Please <br />consult the Rules, Act, and your permit for specific requirements. <br />The estimated liability amount of $1,451,074.00 for Perry Pit, has been provided by corporate surety in the amount of <br />$1,536,595.00. <br />The transfer of this permit does not result in the transfer of any other permits or licenses, with this Division, <br />the State, or Federal Agency, which might be associated with this operation. <br />If you have any questions, contact me. <br />Sincerely <br />Peter S. Hays <br />Environmental Protection Specialist <br />Certified Mail No. 7012 3460 0000 6384 6709, return receipt requested <br />Cc: Tom Kaldenbach, Division of Reclamation, Mining and Safety <br />M.L. Richardson, Asphalt Paving Company <br />Office of Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines <br />