Laserfiche WebLink
112c Annual Report <br />RECENFED <br />APR 082014 Page 2of3 <br />Dlvlslon of Reclamation, <br />Mlning & Catty <br />Pemtittee Name- <br />Tony J. Beltramo & Sons, <br />Inc. <br />Permit Number: <br />M- 1998 -101 <br />Operation Name: <br />Cesar Pit <br />County: <br />Pueblo <br />Annual Fee Due: <br />$791.00 <br />Anniversary Date: <br />March 29, ZD <br />Topsoil <br />replacement <br />depth in. <br />Permit Acreage: <br />160.00 <br />Current Bond Atnt <br />$172,128.00 <br />According to C.R.S. 3432.5 -116 or 3432 -116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Inforniation contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the odes and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />I. Is the site identification sign posted in accordance with Rule 3.1.12(1). YES NO <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). YES NO <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES NO <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? A�a4_ 21 a(q <br />r- <br />5. Does the mine operate more than 180 days per year? <br />If "NO", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />b) approval for INTERMITTENT OPERATION? <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation). <br />8. Number of acres that were newly affected during the current report year. <br />9. Number of acres that were reclaimed during the current report year. <br />10. Estimated new acreage to be affected in the next report year. <br />11. Estimated acres to be reclaimed in the next report year. <br />12. Total acres in various staees of reclamation. since nermitted mining activities began <br />YES NO <br />YES <br />YES O <br />a <br />6 <br />Total acres <br />backfilled: <br />y <br />��� <br />Total acres <br />seeded w / <br />app roved mix: <br />2 <br />Total acres <br />w /topsoil <br />replaced: <br />txz, <br />�a� <br />Total acres <br />mulched w/ <br />approved mulch: <br />m <br />Total acres <br />graded: <br />6 F� <br />����� <br />Total acres <br />apvd fertilizer: r d wl <br />�� <br />f <br />Topsoil <br />replacement <br />depth in. <br />�, <br />Mulch application <br />rate (tons/ac): <br />�YY1 <br />Seed <br />Fertilizer <br />Mulch <br />application <br />method: <br />'n <br />application <br />method: <br />�(7, <br />application <br />method: <br />�D Q <br />