Laserfiche WebLink
i/ <br />112d -1 Annual Report <br />RECE, 2 of <br />MAR 212014 <br />— ` -- - tRSf�''— iafion, <br />Permittee Name: Nuvemco, LI C Permit Number: M -20 -UQ Name: Last Chance #3 & #4 County: Montrose <br />Annual Fee Due: $1,150.00 Anniversary Date: March 22, 2014 <br />Permit Acreage: 49.98 _ Current Bond Amt: $45,250.00 <br />According to C.R.S. 34- 32.5 -116 or 34 -32 -116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />I. Is the site identification sign posted in accordance with Rule 3.1.12(1). <br />YES NO <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). <br />YES NO <br />3. is the mine site in final reclamation (all material extraction and stockpile removal is complete)? <br />YES NO <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? <br />10/30/2012 <br />Note: excavation in connection with SWMP detention ponds. <br />5. Does the mine operate more than 180 days per year <br />ES NO <br />If "NO ", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />YES W <br />b) approval for INTERMITTENT OPERATION? <br />ES NO <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation). <br />49.98 acres <br />8. Number of acres that were newly affected during the current report year. <br />None <br />9. Number of acres that were reclaimed during the current report year. <br />None <br />< 1 acre <br />10. Estimated new acreage to be affected in the next report year. <br />Note: potential approved drilling activities, geologic and bjdget dependent. <br />11. Estimated acres to be reclaimed in the next report year. <br />< 1 acre <br />Note: plan remains to reclaim continuously as drilling, logging and geology completed. <br />12. Total acres in various stages of reclamation, since pern Itted mining activities began: <br />_ <br />Total acres Nil Total acres Nil Total acres Nil Total acres <br />backfilled: seeded w/ w /topsoil mulched w/ <br />Nil <br />approved mix: rc lap ced. approved mulch: <br />Total acres Total acres Topsoil Mulch application <br />graded: Nil fertilized w/ Ntl replacement Nil rate (tons): <br />n/a <br />_ apvd fertilizer: depth (in.): <br />Fertilizer n/a Mulch n/a <br />Seed n/a <br />application application application <br />method: ( method: method: <br />