Laserfiche WebLink
I <br />I <br />{ � M <br />F cJ— j� MAR 17 2014 <br />112c Annual Report Division of Reclamation, <br />Mining & Safety <br />Page 2 of 3 <br />Permittee Name: <br />Yuma County <br />Permit Number: <br />M -2011 -006 <br />Operation Name: <br />Deterding Pit <br />County: <br />Yuma <br />Annual Fee Due: <br />$791.00 <br />Anniversary Date: <br />March 21, 2014 <br />Permit Acreage: <br />56.70 <br />Current Bond Amt: <br />$0.00 <br />According to C.R.S. 34- 32.5 -116 or 34 -32 -116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that, will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />{ Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />}; <br />f 1. Is the site identification sign posted in accordance with Rule 3.1.12(1). <br />YES NO <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). <br />i . <br />YES NO <br />i <br />C 3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? <br />YES NO <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? <br />5. Does the mine operate more than 180 days per year <br />YES <br />` If "NO ", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />YES NO <br />b) approval for INTERMITTENT OPERATION? <br />t <br />YE NO <br />7. Number. of acres currently affected (mining + incomplete and or unreleased reclamation). <br />{ 8. Number of acres that were newly affected during the current report year. <br />y <br />i 9. Number of acres that were reclaimed during the current report year. <br />1 <br />10. Estimated new acreage to be affected in the next report year. <br />-� <br />11. Estimated acres to be reclaimed in the next report year. <br />- <br />i <br />12. Total acres in various stases of reclamation. since permitted mining activities began: <br />Total acres <br />Total acres <br />Total acres <br />Total acres <br />backfilled: <br />seeded w/ <br />w /topsoil <br />mulched w/ <br />approved mix: <br />replaced: <br />approved mulch: <br />Total acres <br />Total acres <br />Topsoil <br />Mulch application <br />graded: <br />fertilized w/ <br />replacement <br />rate (tons): <br />apvd fertilizer: <br />depth (in.): <br />Seed <br />Fertilizer <br />Mulch <br />application <br />application_ <br />application <br />method: <br />method: <br />method: <br />