Laserfiche WebLink
ame <br />A FINAL REPORT <br />CRESSON PROJECT <br />QUALITY ASSURANCE MONITORING AND TEST RESULTS <br />2011 PHASE 5 VALLEY LEACH FACILITY ORE STORAGE <br />AREA 2nd PORTION <br />August 26, 2011 <br />. r. <br />Volume 3 of 3 <br />Prepared for: <br />Cripple Creek & Victor Gold Mining Company <br />r.. <br />Post Office Box 191 <br />100 North Third Street <br />Victor, Colorado 80860 <br />Telephone: 719.689.,4922 <br />Facsimile: 719.689.3254 <br />Prepared by: <br />AMEC Earth & Environmental <br />Colorado Center Tower Two <br />2000 S. Colorado Blvd. Suite 2 -1000 <br />e " Denver, Colorado 80222 <br />i Telephone: 303.935.6505 <br />Facsimile: 303.935.6575 <br />Project# 84201125E0 <br />