Laserfiche WebLink
I <br />z <br />N 53.000 <br />/ <br />N <br />I <br />/ <br />P E IIVJ <br />N 50,000 <br />�ljlm <br />ii <br />II <br />J / <br />/ <br />/ <br />t� <br />P <br />SQUAW MT. TUNNEL PORT <br />(RE MED7ED) <br />1 <br />O p <br />or <br />1„ V <br />/ -- THOMPSON S <br />KITTY LANE SH / <br />40 <br />-- <br />I it /I <br />i <br />1 <br />aer� <br />11 r l / 111 <br />� 11 it <br />�I <br />ECONOMIC /� /` <br />(COLUMBINE) <br />TUNNEL PORRTTAL ' <br />D <br />A R MAYS AFB <br />0 <br />/ <br />1 1 <br />1 <br />L <br />11 <br />-n <br />UA <br />QUEEN <br />/ <br />� 11 <br />1 � <br />r <br />C. <br />,A <br />I <br />1 <br />00 0 300 600 FEET <br />REFERENCE: <br />EXISTING GROUND TOPOGRAPHY BY CC &V WAS REVISED FROM <br />PHOTOGRAPHY TAKEN 9 -25 -2006. SOME AREAS OF REVISION BASED <br />PART ON SURVEY DATA SUPPLIED BY FORESIGHT WEST SURVEYING IN' <br />5 -29 -2007. S: \CAD \1125 — CC &V PHASE 5 <br />VLF \RECV \20070622 — PROJECT MAP \06110— TOPO— REVISED2.DWG <br />LEGEND: <br />EXISTING GROUND CONTOUR AND EL, FEET <br />LIMITS OF TREES <br />PAVED ROAD <br />EXISTING UNPAVED ROADS <br />-- UNDERGROUND WORKINGS <br />PROPOSED LIMITS OF PHASE 5 <br />i EXISTING PHASE LIMITS <br />OPEN OR COLLAPSED SHAFT <br />Q OPEN OR COLLAPSED ADIT <br />