My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-01-31_REPORT - p2011032
DRMS
>
Day Forward
>
Report
>
Prospect
>
2014-01-31_REPORT - p2011032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 10:40:41 AM
Creation date
2/3/2014 1:45:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
p2011032
IBM Index Class Name
REPORT
Doc Date
1/31/2014
From
Running Sun Advisory Services LLC
To
DRMS
Annual Report Year
2014
Permit Index Doc Type
Annual Fee/Report
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MP Annual Report <br />RECEIVED <br />JAN 31 -2014 <br />DAnSION ELF Ree b4 <br />MININOMb 41V <br />Page 2 of 4 <br />Permittee Name: <br />Running Sun Advisory Services LLC <br />Permit Number: <br />P- 2011 -032 <br />Operation Name- <br />O aura Tunnel Exploration Project <br />County: <br />San Juan <br />Annual Fee Due: <br />$86.00 <br />Anniversary Date: <br />February 15, 2014 <br />Permit Acreage: <br />2.60 <br />Current Bond Amt: <br />$6,783.91 <br />According to Colorado Statute, each year, on the anniversary date of the permit, an operator shall submit the Annual Fee, <br />an Annual Report and Map showing the extent of current disturbances to affected land, required monitoring information, <br />reclamation accomplished to date and during the preceding year, any new disturbance that is anticipated to occur during <br />the upcoming year, any reclamation that will be performed during the upcoming year, the dates for the beginning of active <br />operations, and the date active operations ceased for the year. <br />Information contained in this report is required and will be reviewed by the Division upon receipt and prior to the next <br />compliance inspection of the site. If, while completing this report, you learn that your site is not in compliance with the <br />rules and the act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the affected area boundary clearly marked if you have an excavation or portal? ES NO <br />2. Is the site in final reclamation? YES NO <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />3. What was the date of last exploration activity? No activity to date <br />4. What date did prospecting activity end, or what date is it expected to end? Rule 5.6.1(e). No activity to date <br />5. Number of acres currently affected (exploration+ incomplete reclamation). 0.0 <br />6. Number of acres that were newly affected during the current report year. 0.0 <br />7. Number of acres that were reclaimed during the current report year. 0.0 <br />8. Estimated new acreage to be affected in the next report year. 2.6 <br />9. Estimated acres to be reclaimed in the next report year. 0.0 <br />10. Total acres in various stages of reclamation, since permitted exploration activities began: <br />Total acres <br />0.0 <br />Total acres <br />0.0 <br />Total acres <br />0.0 <br />Total acres <br />0.0 <br />backfilled: <br />seeded w/ <br />w /topsoil <br />mulched w/ <br />approved mix: <br />replaced: <br />approved mulch: <br />Total acres <br />0'0 <br />Total acres <br />0'0 <br />Topsoil <br />0'0 <br />Mulch application <br />n/a <br />graded: <br />fertilized w/ <br />replacement <br />rate (tons /ac): <br />a vd fertilizer: <br />depth (in.): <br />Seed <br />n/a <br />Fertilizer <br />n/a <br />Mulch <br />n/a <br />application <br />application <br />application <br />method: <br />method: <br />method: <br />11. Is weed control being conducted in accordance with an approved Weed Control Plan? YES NO /A <br />If "YES ", indicate the weed species, control area, control type, application rate and treatment date on the report map. <br />12. Is adequate topsoil reserved for reclamation, based on your approved NOI? YES NO N/ <br />If "NO ", please explain: <br />
The URL can be used to link to this page
Your browser does not support the video tag.