Laserfiche WebLink
—n o n1 <br />Page 2 of 3 <br />,1:oR(Ifl-1 `�� 9rp CID had -emu c� <br />112c Annual Report <br />-tom ■ <br />Permittee Name: <br />MWCA, Inc. <br />Permit Number: <br />M- 1977 -227 <br />- <br />Operation Name: <br />Mesita Hill Pit <br />County: <br />Costilla <br />Annual Fee Due: <br />$791.00 <br />Anniversary Date: <br />February 9, 2014 AN <br />P it A <br />201.00 <br />Current Bond Amt <br />$67,462.00 13MSION OF <br />2 2014 <br />errm Acreage: urren on ECLAMATION <br />MINING AND SAFETY <br />According to C.R.S. 34- 32.5 -116 or 34 -32 -116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). YES NO <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). YES NO <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES NO <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? 2� -S44e <br />5. Does the mine operate more than 180 days per year? <br />If "NO ", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />b) approval for INTERMITTENT OPERATION? <br />7 <br />YES NO <br />YES <br />YES <br />Number of acres currently affected (mining + incomplete and or unreleased reclamation). S-6LC1`- <br />8. Number of acres that were newly affected during the current report year. <br />9. Number of acres that were reclaimed during the current report year. <br />10. Estimated new acreage to be affected in the next report year. <br />11. Estimated acres to be reclaimed in the next report year. <br />12. Total acres in various stages of reclamation, since permitted mining activities began: <br />6 <br />0. <br />G�, <br />prCe-S <br />Total acres <br />&5 , <br />Total acres <br />Total acres <br />e5i` <br />Total acres <br />backfilled: <br />/00 <br />cw/& S <br />seeded w/ <br />approved mix: <br />a <br />w /topsoil <br />replaced: <br />5-0 <br />c&-5 <br />mulched w/ <br />approved mulch: <br />n <br />Total acres <br />graded: <br />r�' <br />yes <br />Total acres <br />fertilized w/ <br />apvd fertilizer: <br />%� <br />��`��' "` <br />Topsoil <br />replacement <br />depth (in.): <br />e , <br />/l <br />Mulch application <br />rate (tons/ac): <br />Seedy <br />application <br />method: <br />/Va -4� � <br />Fertilizer <br />application <br />method: <br />Q <br />' <br />Mulch <br />application <br />method: <br />I—A <br />