My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_REVISION - M1978311
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1978311
>
_REVISION - M1978311
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:12:38 PM
Creation date
12/12/2013 2:16:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978311
IBM Index Class Name
REVISION
Doc Name
Reclamation Map cover letter and map TR03
From
Gold Eagle Mining, Inc
To
DRMS
Type & Sequence
TR3
Email Name
RCO
Media Type
d
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bold Eagle Mining, Inc. <br /> 845 EMain Street—Montrose,C0 81401— 930 249-0404—Fax 970249 3m <br /> 12/06/2013 RECEIVED <br /> Division of Reclamation, <br /> DEC 10 2013 4--- <br /> Mining Safety Attention : Minerals Program DIVISION OF RECLAMATICI I <br /> 1313 Sherman Street, Room 215 t113' C,,FEI I <br /> Denver, CO 80203 <br /> To Whom It May Concern: <br /> Attached are the Reclamation Maps as requested. GEMI is in agreement with the <br /> proposed Technical Revisions. However it must be noted that before any reclamation <br /> activities must ensue,will require the approval of DOE. DOE has informed us that <br /> reclamation is not an approved activity during the PEIS process. Nor will they review any <br /> reclamation plans during the PEIS process or review period and litigation process. <br /> Please note that electronic versions will be sent today and hard copies mailed. My <br /> apologies if electronic versions are sub-standard. <br /> RE: Ellison Mine, Permit M 1978-342q`echnical Revision TR-04 <br /> 1. Agree <br /> 2. Agree <br /> 3. Agree <br /> 4. Zircon storage buildings are used to secure equipment and materials during various <br /> activities as required by DOE lease agreement. One is used by DOE and other GEMI. <br /> 5. As shown on map. <br /> 6. Grading and sloping will be accomplished by moving materials uphill to a maximum <br /> of 3H:1 V slope in order to reduce the football of reclamation area. <br /> 7. Re-vegetation will require less than '/2 acre. <br /> 8. This date will depend on DOE approval. <br /> RE: Burros Mine: Permit M-1977-297,vTechnical Revision TR-06 <br /> I. Agree <br /> 2. Agree <br /> 3. Agree <br /> 4. Storm water berms will construct in the channels using native boulders in order to <br /> assimilate the natural conditions of the surrounding area. Locations are displayed on the <br /> attached map and monitored according to storm water permit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.