My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-11-09_REVISION - C1981025
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981025
>
2009-11-09_REVISION - C1981025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:56:53 PM
Creation date
9/30/2013 9:33:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981025
IBM Index Class Name
REVISION
Doc Date
11/9/2009
Doc Name
Cost Estimate
Type & Sequence
SL6
Email Name
BFB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLO0.AD0 <br />RECLAMATION <br />MINING <br />SAFETY <br />Permit No. C -81 -025 <br />Mine name: West Elk <br />TASK LIST (DIRECT COSTS) <br />Task no. Task description <br />Colorado Division of Reclamation, Mining and Safety <br />Reclamation Cost Summary <br />demo Remove signs and markers <br />1 Revegetate inter -pond areas (15% Phase III liability) <br />none Weed control in inter -pond areas <br />(3 sprayings over 10 -year period X $250) <br />INDIRECT COSTS <br />Form <br />Used <br />demo <br />reveg <br />none <br />none <br />Prepared by: TK <br />Permit or job action: SL -06 <br />Date: 11/9/2009 <br />2.02% <br />County: Gunnison <br />total = <br />Task Hours <br />Direct Cost <br />4 <br />$242 <br />0.89 <br />$498 <br />12.00 <br />$750 <br />GRAND TOTAL DIRECT COSTS 16.89 $1,490 <br />Liability insurance: <br />2.02% <br />% of direct costs <br />total = <br />$30 <br />Performance bond: <br />1.05% <br />% of direct costs <br />total = <br />$16 <br />Job superintendent: <br />16.89 <br />hrs. at $ <br />39.38 per hour total = <br />$665 <br />Profit: <br />10.00% <br />% of direct costs <br />total = <br />$149 <br />TOTAL O & P= <br />$860 <br />CONTRACT AMOUNT (direct + O & P)= <br />$2,350 <br />Financial warranty processing (legal /related costs): NA <br />Engineering work and /or bid preparation: 4.25% % of contract $100 <br />Reclamation management and /or administration: 5.00% % of contract $117 <br />NA % of direct costs <br />Total indirect reclamation costs $1,077 <br />Total performance bond amount (direct costs plus indirect costs) $2,567 <br />
The URL can be used to link to this page
Your browser does not support the video tag.