Iccl <br />� <br />• <br />Note: An Amec field representative monitored structural fill material temperatures placed within the areas of fill <br />during all shifts. Average structural fill temperatures were above 32 °F. <br />Clay (SLF) Processing: <br />Cameron Site: Clay processing resumed during this reporting period. <br />Squaw Gulch Site: Clay stripping and stockpiling occurred during this reporting period. <br />Underdrain System: <br />Secondary Underdrain: No work was performed on the Secondary underdrain during this reporting period. <br />A total of 1380 feet of Secondary underdrain has been completed. <br />Primary Underdrain: No work was performed on the Primary underdrain during this reporting period. <br />A total of 1280 feet of Primary underdrain has been completed. <br />Temporary Underdrain: No work was performed on the temporary underlain during this reporting period. <br />Tree /Slash Clearing, Chipping: <br />Seed Masters paused operations until further notice. <br />B) Underground Workings <br />Exploratory excavation was performed on underground working No. 6132 and No. U6273. These sites require <br />further excavation and exploratory efforts. <br />Confirmatory drilling was performed on underground working No. 6132, No. 6187 during this reporting period. All <br />drill hole locations were established on a 4 -foot center isolating any voids found. Further remediation efforts will be <br />ongoing until remediated. Summary of the remediation efforts will follow 100% remediation. <br />Underground working No. 6051, Concrete Plug was placed and will continue with remediation efforts until <br />remediation is complete. A cemented rockfill is scheduled to be placed to complete this working. <br />Underground Working No. 6122 requires geognd and will be prepared for this application as remediation efforts <br />continue. <br />Underground Working No. 6239, is considered remediated, 3 layers of Geogrid were placed per directive provided <br />per project specifications. No other sites were remediated during this reporting period. <br />Q Highway 67 <br />Fill continued to be hauled to the southern portion of the Highway 67 embankment using several Cat 777 haul <br />trucks and several Cat 740 haul trucks. <br />The structural fill material was placed in an approximately 18 to 36 inch lifts by Cat D10R, John Deere 1050 and <br />Cat D8R Dozers. The Cat CS56B vibratory, 10 -ton, smooth -drum roller completed the minimum of four passes <br />(Method Specification Applies) over each lift surface placed. It should be noted: haul trucks, loaded and unloaded, <br />drove over the backfill surface contributing to the overall compaction of the lift. In addition a Cat 330B excavator <br />equipped with a jackhammer (hammer hoe) broke up the oversize material encountered. The final structural lift <br />surface was placed on Tuesday 8.20.13 and final grading of the structural fill occurred using a GPS equipped D6R. <br />Page 2 of 7 MLE2 WE 08.24.13.doc <br />