Laserfiche WebLink
r <br />REQUEST FOR TECHNICAL REVISION <br />Jubilee Venture LLC Eagle Mine Project <br />M- 2011 -029 <br />The company changed its mining direction from South to North to West to East. There is no increase to <br />the permitted area . The change in direction would allow for a more efficient movement of the <br />reclaimed material. It also enhances the efficiency and safety of the operation for the heavy equipment <br />operators moving material to be mined and those operators moving the reclamation material back to <br />the mined area. <br />The company added a 500 gallon rented (provided by Pilot Fuel Company) fuel tank to the South East <br />Boundary of the permitted area. The fuel tank sits South of the middle of the Tailing Pond. The tank sits <br />within a 600 gallon containment tank with a safety berm surrounding the tank. The tank sits on steel <br />girders and has met MSHA approved safety standards. <br />The company increased its Fresh Water Pond to a Total of 65 feet East West, and 77 feet North South <br />by 15 feet deep. The tailing pond was increased to a total of 55 % feet East West by 40 %: feet North <br />South. The ponds are basically in the same location as previously described. <br />