(D -J9 -2) was constructed as designed but at an interim location west of its final design <br />location. The lower collection ditch was constructed as designed. <br />The western side of the coal mine waste pile has been cleared of all organic material <br />and coverfill has been salvaged so it is ready to accept refuse material. The eastern <br />side of the coal mine waste pile will need some topsoil and coverfill salvaged before <br />refuse material can be placed. The french drain mentioned above will need to be <br />constructed through the central portion of the pile. <br />To the best of my knowledge and belief, with the exceptions noted above regarding the <br />location of interim ditches, the coal mine waste bank founding and drainage system <br />were constructed in accordance with the approved plan and meet the requirements of <br />the Regulations of the Division of Reclamation, Mining and Safety. As stated above, <br />more work needs to be performed to salvage available topsga and coverfill material <br />before refuse is placed in the eastern portion of the ch drain needs to <br />installed in the central portion of the pile.�+`p' -- °o;! <br />/ Kt <br />Jars ZNtoveC. N00 Date <br />�° • 0 <br />P.E. elf, g.1 01 <br />Page 2 of 2 <br />