My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-09-03_REVISION - M2005044
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2005044
>
2013-09-03_REVISION - M2005044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:00:15 PM
Creation date
9/5/2013 9:48:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005044
IBM Index Class Name
REVISION
Doc Date
9/3/2013
Doc Name
Conversion Application
From
Lincoln County
To
DRMS
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D <br />HOFFMAN PIT <br />MINING PLAN <br />The operation in the extension of the Hoffman Pit will commence in late fall of 2013 and given <br />the quantity of material available continue until 2025. This operation will be active but will be used less <br />than 180 days per year. <br />Topsoil runs from 2 to 6 inches in depth and will be salvaged and stockpiled for use in the <br />reclamation of the site. These stockpiles, if needed, will be seeded with a fast growing cover crop, prosso <br />millet, to stabilize the stockpiles and prevent erosion until the final pit reclamation is started. Lincoln <br />County plans to accomplish the final reclamation in phases in order to minimize the area open and subject <br />to either wind or water erosion. These stockpiles will be separated from overburden stockpiles and <br />separated from operation traffic and any naturally occurring stream channels or drainage ways. <br />The overburden at this site varies in thickness from 1 to 4 feet. Some of the overburden will be <br />utilized to provide binder for the sand and gravel being mined. The overburden not used as binder will be <br />stockpiled separate from the topsoil and seeded with a cover crop in the same manner as the topsoil to <br />prevent erosion. <br />The sand and gravel removed by this operation runs from 10 to 20 feet in thickness. Below the <br />sand/gravel being mined lies a layer of conglomerate rock and clay that will not be mined. No secondary <br />will be mined or extracted. The sand/gravel mined will be used in the construction and maintenance of <br />Lincoln County Roads in Districts I and 2. <br />A tracked dozer or front end loader working from north to south or east to west will push the sand <br />and gravel being mined into stockpiles. A front end loader will then load this material into the haul trucks. <br />The stockpile of sand/gravel could remain in place for several weeks. The pit as it is worked will be day <br />lighted out to the south as was the Fisher Pit just to the west of this site. The north slopes of the pit will be <br />reclaimed to 4 to 1 or flatter when finally reclaimed; during mining operations these slopes may be slightly <br />steeper than the finished slopes. <br />The haul road used to access the site (see map EXHIBIT E) is approximately 400 feet long by 18 <br />feet wide and entirely within the pit boundaries; the other access route will be through land leased from the <br />Shriner's Children Hospital and County Road 28. No new or improved roads will be required to operate at <br />this site as the haul road already exists. No drainage structures will be required. The only permanent man- <br />made structures at this site consist of the barbed wire and electric fences on the north, west and south <br />boundaries of the pit. No processing equipment will be located in the pit area. All equipment used to mine <br />and haul the sand and gravel will be mobilized to the site each time material is to be extracted and then <br />removed from the site. <br />This will be an open pit operation with the material being pushed by either a tracked dozer or <br />front -end loader into a stockpile that is then loaded into trucks by a front -end loader for removal from the <br />pit. At any one time at least 5 or 6 stockpiles of material will remain in the pit. There will be at least two <br />stockpiles of topsoil covering approximately 0.5 acre: two to three stockpiles of overburden covering from <br />0.75 to 1.0 acre and one small stockpile of sand and gravel of less than 0.25 acre. The maximum area of <br />this pit that is not reclaimed at any one time should not exceed 10 to 12 acres. <br />No water will be used in conjunction with this operation. No ground water has been encountered <br />in the operation of this pit to date. In order to minimize any disturbance to the hydrologic balance only a <br />small area of the pit will be exposed and sloping will be done to control any runoff. Erosion Control BMP's <br />such as temporary berms, erosion control bales or temporary seeding would be utilized to protect any <br />drainages. No existing water rights should be affected by operations at this site. <br />No petroleum products such as fuel or lubrication products will be stored on site. All the <br />equipment will be serviced and refueled off site except for the loader or dozer these will be fueled and <br />serviced on the haul road. <br />After the current phase of mining is completed the county will reclaim this area and mining will <br />move to Phase Two which is slightly east of the currently mined area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.