Laserfiche WebLink
-4- <br />12. Primary future (Post - mining) land use (check one): <br />® Cropland(CR) Pastureland(PL) General Agriculture(GA) <br />�✓ Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br />Residential(RS) Recreation(RC) Industrial /Commercial(IC) <br />Developed Water Resources(WR) Solid Waste Disposal(WD) <br />13. Primary present land use (check one): <br />Cropland(CR) Pastureland(PL) <br />Rangeland(RL) Forestry(FR) <br />Residential(RS) Recreation(RC) IJ <br />Developed Water Resources(WR) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): <br />Surface mining with Trucks <br />15. On Site Processing: _Z Crushing( Greening <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial /Commercial(IC) <br />13.1 Briefly explain mining method (e.g. truck/shovel): <br />Processing material with a screening plant may be an option in the future. <br />List any designated chemicals or acid - producing materials to be used or stored within permit area: <br />None <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />Moving existing boundaries 407ft to the NW and Wand the SE boundary 226ft south. See <br />attached map. <br />