Laserfiche WebLink
general plan is to have backfilling and reclamation occurring as closely behind quarrying as possible. <br />While overburden is being removed from Mining Area A2, backfilling will be taking place in Back Fill Area <br />BF II, from there backfilling will begin in BF IV and proceed east and then south as mining areas are <br />depleted. Overall depths of overburden will vary but a minimum depth of two (2) feet will be <br />maintained to provide a sufficient base for vegetation. <br />Mining Area B, D <br />Additional reserves within the permit boundary are outlined in Mining Areas B (possible reserves) and <br />Mining Area D (probable reserves). These reserves will be evaluated and mined as previously mined <br />acres are reclaimed and released from the Reclamation Board. <br />Page 2-Owl Canyon 2013 Revision <br />