Laserfiche WebLink
The Upper Carbon Junction Channel was included in the HEC RAS analysis and was determined to be <br />more than adequate to carry the 100 year design flow. HEC RAS cross sections with water surface <br />elevations are included in Appendix A. <br />Enclosed are a proposed public notice, a revision application, Exhibits (C1.0, CM, C1.2, C1.3, C2.0), HEC - <br />RAS cross sections and the 2007 culvert analysis. If you have any questions, please do not hesitate to <br />contact me. <br />jc ly, <br />Rob Harries, P.E. <br />Goff Engineering & Surveying, Inc. <br />Enclosures: CDRMS Revision Application <br />Proposed Public Notice TR 17 <br />Exhibits C1.0, CM, C1.3 -C1.4, C2.0 <br />Appendix A <br />Page 3 <br />