Laserfiche WebLink
9/3/13 State.co.us Executive Branch Mail - Fwd: TR40 response and retaining the monitoring wells <br />know, so we can decide if we can continue to monitor the <br />mine void in the future. Has the DRIVIS determined if MWNW <br />can be merely repaired and it is still functional or a new <br />monitoring well into the mine void needs to be drilled. <br />Energy Fuels answer to stop monitoring the mine void in <br />Phase 2 is not meeting the regulations that I quoted in my <br />previous objection and you cited in your violation. At our <br />meeting with you and Dan in January 2012, we asked the <br />DRMW enforce the regulations. Thank you for doing this as <br />the Environmental Protection Specialist for the DMRS. <br />IWrOPI R Y i 0 <br />https: / /mail.g oog le.conVmai I /u /0 / ?ui =2 &i Ire29129fcb5 &view = pt &search =i nbox&th= l4Oe4dd84273c427 2/2 <br />