Laserfiche WebLink
Ranch, LLP "; the Perry's recently sold their property to 20 Mile Sheep, LLC, which is included as a <br />listed owner; the William Rogers listing included both a street address and PO Box, the street address <br />has been deleted, as mail is delivered to the PO Box. The ownership listing in the PAP has been <br />updated and copies of the revised pages accompany these responses for replacement in the PAP. <br />8) Division Response: In order to address the initial adequacy comment, the Division requests a <br />review and concurrence letter from either the USFWS or the CPW addressing any updates <br />associated with Federal or State TES. The Division understands that TC is currently in discussions <br />with CPW personnel to receive concurrence with TC's response to the Divisions initial comment. <br />Please provide the Division with a copy of the concurrence letter if received bh the CPW. <br />Response: Accompanying these responses is a copy of the CPW consultation letter. <br />12) Division Response: It appears that the revised text submitted with the adequacy responses ,10'r <br />page 2.05 -14 does not correspond with the currently approved text. Please provide a revised page <br />2.05 -14 to address the Divisions previous adequacy comment and correspond with approved text. <br />Response: The referenced page has been reviewed and revised for consistency with the approved text <br />and to incorporate the referenced changes. A copy of the revised page accompanies these responses <br />for replacement in the PAP. <br />22) Division Response: The Division has addressed the Draft Reclamation Cost Estimate associated <br />with RN -6. Due to the addition of the disturbance associated with Phase II of the RDA Expansion, <br />Tasks 134, 146, and 185 have been revised. In addition, two tasks were identified as tasks entered <br />twice (Tasks 072 and 152) and these tasks were removed <br />Based on TC's response to the Division's initial comment, the Division has reviewed indirect costs <br />associated with 'job superintendent" and "reclamation and administration " costs. The 'job <br />superintendent" job hours have been revised to more accurately represent the hours estimated to <br />be spent on site rather than the standard 50% of total job hours. The "reclamation and <br />administration" costs have been revised to reflect a smaller percentage based on a <br />�$10, 000, 000.00 total job cost as compared to a standard 5% job cost. Please review the attached <br />revised summary sheet to determine if TC concurs with the Division's estimate. <br />Response: TC has reviewed the CDRMS's revised Reclamation Liability Cost Estimate, and accepts <br />the revised figures as an accurate estimate of the current reclamation liabilities associated with the <br />Foidel Creek Mine. <br />