Laserfiche WebLink
3. List any additional changes to the original prospecting and reclamation plan or <br />any unexpected problems (such as unexpected water or artesian conditions <br />encountered). (Attach additional pages, if needed.) <br />Have not drilled holes OM -YR- 02, 10, 14, 15R, 20, 21 R, 22, 25, 33, 36, 37, 38, 39, 40, <br />Will not drill OM- YR -19, 28 as drilling results show they are beyond the outcrop. <br />Surface Basalt Boulder colluvium was much thicker than anticipated, up to 1000 ft. thick. <br />4. When do you expect to complete all exploration and reclamation activities for <br />this project? <br />Drilling for this exploration drilling protect will conclude by Nov 2014 Phase 2 drilling is expected to start up again in the spring of 2014 <br />5. Does the prospector wish this report to be considered confidential? See Rule <br />2.02.7(2). If yes, attach a justification for the request. <br />6. Additional Comments: <br />Date: <br />(11/01) <br />Signature of Authorized Representative <br />Oxbow Mining, LLC. <br />Company <br />