My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-08-09_PERMIT FILE - C1996083A (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2013-08-09_PERMIT FILE - C1996083A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:23:39 PM
Creation date
8/29/2013 8:13:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
8/9/2013
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate RN3
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 2 Mine Reclamation Cost Estimate RN -3 Page 83 of 312 <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />0.90 Minutes <br />0.60 Minutes <br />Site Altitude: 6100 feet <br />Net Correction: 0.830 NA <br />Travel Time: <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire penetration 5.0 <br />Haul Route: <br />Seg # <br />Scraper <br />Push Dozer <br />Source <br />Altitude Ad': <br />1.000 <br />NA <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />NA <br />(CAT HB) <br />Site Altitude: 6100 feet <br />Net Correction: 0.830 NA <br />Travel Time: <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire penetration 5.0 <br />Haul Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />2600.00 <br />0.00 <br />5.00 <br />5.00 <br />2218 <br />1.35 <br />Haul Time: 1.35 minutes <br />Return Rrnrte- <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />%) <br />Total Res <br />%) <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />2600.00 <br />0.00 <br />5.00 <br />5.00 <br />2814 <br />1.07 <br />Return Time: <br />Total Scraper team cycle time <br />Adjusted for job conditions <br />Selected Number of Scrapers <br />Adjusted single scraper team (unit) hourly production <br />Adjusted multiple scraper team (fleet) hourly production <br />Unadjusted unit production /hour: 577.04 LCY /Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $1.163 /LCY <br />1.07 <br />minutes <br />3.92 <br />minutes <br />478.94 <br />LCY /Hour <br />2 <br />Scraper(s) <br />478.94 <br />LCY /Hour <br />478.94 <br />LCY /Hour <br />Total job time: 101.00 Hours <br />Total job cost: $56,244.80 <br />
The URL can be used to link to this page
Your browser does not support the video tag.