Laserfiche WebLink
DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3567 <br />FAX: (303) 832 -8106 <br />STATE OF COLORADO <br />COLORADO <br />D I V I S I ON OF <br />RECLAMATION <br />MINING <br />SAFETY <br />August 28, 2013 John W. Hickenlooper <br />Governor <br />Nick Michael Mike King <br />Union Milling Company, LLC Executive Director <br />P.O. Box 620490 <br />Loretta E. Pineda <br />Littleton, CO 80162 Director <br />Re: Leadville Mill; DRMS File No. M -1990 -057; Technical Revision No. 4 — Adequacy <br />Review No. 3 <br />Dear Mr. Michael, <br />The Division has identified several other comments and questions that must be addressed prior to the <br />Division's decision due date. Please be advised that if you are unable to satisfactorily address any <br />concerns identified in this review before the decision date, it will be your responsibility to request <br />an extension of the review period. If there are outstanding issues that have not been adequately <br />addressed prior to the end of the review period, and no extension has been requested, the Division <br />will deny this application. <br />The Division met with Union Milling Company on August 23, 2013 to discuss the remaining <br />adequacy issues of Technical Revision No. 4. As we discussed during the meeting the Division has <br />concerns with the long term structural integrity of the geosynthetic clay liner (GCL) as it relates to the <br />seeps on the east side of the tailings storage facility (TSF). The Applicant has demonstrated to the <br />satisfaction of the Division that the GCL can be installed without premature hydration. However, the <br />Applicant must provide additional information which demonstrates that the GCL can withstand the <br />external hydrostatic pressure from the seeps. The Applicant may provide any available data from <br />laboratory or field testing from the manufacturer which demonstrates the capacity of the GCL to <br />withstand hydrostatic pressure. <br />As previously mentioned, if you are unable to provide satisfactory responses to any inadequacies prior to <br />August 31, 2013, it will be your responsibility to request an extension of time to allow for continued <br />review of this Technical Revision. If there are still unresolved issues when the decision date arrives and <br />no extension has been requested, the Technical Revision will be denied. <br />If you have any questions, please contact me at (303) 866 -3567 x8116. <br />Sincerely, <br />Lt C &---- <br />Michael A. Cunningham <br />Environmental Protection Specialist <br />Office of Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines <br />