My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-08-27_PERMIT FILE - M2013056
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2013056
>
2013-08-27_PERMIT FILE - M2013056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:24:24 PM
Creation date
8/28/2013 7:48:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2013056
IBM Index Class Name
PERMIT FILE
Doc Date
8/27/2013
Doc Name
New 110(2) Application
From
Richard Fretterd
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-iii- <br />• The Colorado State Historical Preservation Office regarding properties of historical significance including the need for an <br />archeological survey, procedures for requesting a file search, and inventory forms to identify structures. <br />• Colorado Division of Water Resources with regard to the administration of water rights; <br />• Colorado Department of Public Health and the Environment, Water Quality Control Division, with regard to the discharge of <br />pollutants into the waters of the State; <br />• Colorado Department of Public Health and the Environment, Air Pollution Control Division, with regard to the need for a fugitive <br />dust permit; <br />• U.S. Bureau of Land Management or the U.S. Forest Service if the proposed operation will occur on federal lands; <br />• U. S. Army Corps of Engineers regarding a dredge and fill (404) permit; and <br />• The County Planning Department for the county or counties in which your proposed operation is located. Section 34-32- 109(6), <br />C.R.S. requires a mining operator to be responsible for assuring that the mining operation and the post - mining land use comply with <br />local land use regulations and any master plan for extraction adopted pursuant to Section 34-1 -304, C.RS. <br />PERMIT APPROVAL: <br />An applicant will not be issued a reclamation permit until notified by the Office that this application and the required performance and <br />financial warranties have been approved. Alternatively, an automatic approval will occur where the Office fails to notify the <br />applicant/operator that the application has been denied. This decision must be made thirty (30) calendar days from the date the application <br />was submitted. However, the performance and financial warranties must be submitted and approved by the Office before the permit will <br />be issued even if you receive an automatic approval. NO MINING OPERATIONS SHALL BEGIN UNTIL A PERMIT IS ISSUED <br />(Rule 4.1(2)). <br />NOTICE REOUIREMENTS: <br />Within ten (10) days after filing, mail or personally serve a copy of the notice described in Rule 1.6.2(1)(c) to all owners of record of <br />surface rights to the affected land and all owners of record of lands that are within 200 feet of the boundary of the affected land <br />(Rule 1.6.2(1)(d)(i) and (ii). In addition, you must publish once in a newspaper of general circulation, in the locality of the proposed <br />mining operation, the notice. described in Rule 1.6.2(1)(c). A copy of a form which includes all required information for the notice has <br />been attached for your use. You will need to provide the Office proof of notice nn 'or to the decision date. Proof of notice may be by <br />submitting return receipts of a certified mailing or by proof of personal service (Rules 1.4.1(4), 1.4.2(4)(c) and 1.6.2(1)(d)). <br />NOTE TO CONIMENTORS /OBJECTORS: <br />It is likely there will be additions, changes, and deletions to this document prior to final decision by the Office. Therefore, if you have any <br />comments or concerns you must contact the applicant or the Office prior to the decision date so that you will know what changes may <br />have been made to the application document. <br />The Office is not allowed to consider comments, unless they are written, and received prior to the end of the public comment period. You <br />should contact the applicant for the final date of the public comment period. <br />If you have questions about the Mined Land Reclamation Board and Office review and decision or appeals process, you may contact the <br />Office at (303) 866 -3567. <br />COMPLETION OF MINING: <br />Upon completion of any phase of reclamation, you should consult Rule 3.1 for reclamation standards and 4.16 for details on how to <br />request a reclamation responsibility release from the Board. <br />
The URL can be used to link to this page
Your browser does not support the video tag.