Laserfiche WebLink
112 Annual Report <br />Page 2 of 3 <br />Permittee Name: <br />Jubilee Venture, LLC <br />Permit Number: <br />M- 2011 -029 <br />Operation Name: <br />Eagle Mine <br />County: <br />Moffat <br />Annual Fee Due: <br />$633.00 <br />Anniversary Date: <br />August 16, 2013 <br />Permit Acreage: <br />13.50 <br />Current Bond Amt: <br />$33,726.00 <br />According to C.R.S. 34- 32.5 -116 or 34 -32 -116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). 0 NO <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). YE NO <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES NO <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. r <br />4. What was the date of last excavation, processing or hauling activity at the mine? OA) 6�YVC- <br />5. Does the mine operate more than 180 days per year YES <br />If "NO ", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? YES <br />b) approval for INTERMITTENT OPERATION? YES <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation). a j <br />8. Number of acres that were newly affected during the current report year. <br />Number of acres that were reclaimed during the current repo J SCEIVED <br />10. Estimated new acreage to be affected in the next report year. A11 <br />r, 1 ?_ 2013 <br />11. Estimated acres to be reclaimed in the next report year. DIVISION <br />MINING F RECLAMATION <br />12. Total acres in various states of reclamation, since permitted mininsA1Q&fi$ l beean: <br />!re,1 cJC= 4 S <br />I �1) Uh <br />lZZ <br />Total acres <br />Total acres <br />sv/ <br />Total acres C <br />Total acres <br />backfilled: <br />Q <br />seeded w/ <br />w /topsoil <br />l <br />ulched w/ <br />approved mix: <br />replaced: <br />roved mulch: <br />Total acres <br />Total acres <br />Topsoil <br />tha� <br />Mulch application <br />graded: <br />O <br />fertilized w/ <br />replacement <br />rate (tons): <br />apvd fertilizer: <br />depth (in.): <br />/!It rs 2U <br />Seed <br />application <br />bVr— <br />Fertilizer <br />applicationQl>� <br />Mulch <br />application <br />-�—� <br />7�C -nom/ <br />method: <br />method: <br />method: <br />