Laserfiche WebLink
Project: <br />Bowie Mine Gob Pile Road <br />• - CEOTECH j <br />Client / BowieeResources / Tamme Stover <br />Contractor / Rep: <br />Tribble & Sons Excavating / Seth Tribble <br />Cavil, Structural & Geotechnical Engineers <br />222 22 South AA <br />th Park Ave. • Ontrose, CO 81401 <br />Ph.: (970) 249 -5828 - FAX: (970) 249 -0945 <br />CONSTRUCTION MATERIALS TESTING LABORATORY <br />Project NO: <br />2012274 -CMT <br />Date: <br />11/29/2012 <br />Technician: <br />I Harshman <br />ASPHALT NUCLEAR DENSITY <br />TEST SHEET <br />TEST <br />NUMBER <br />LOCATION <br />LIFT NO. <br />SAMPLE NO. <br />MARSHALL <br />UNIT WT. <br />(pcf) <br />THEO. MAX <br />DENSITY <br />(pd) <br />NUCLEAR <br />coRREc=4 <br />(Pcf) <br />ACTUAL <br />UNIT WT, <br />(Pcf) <br />PERCENT <br />coravAcnON <br />% VOIDS <br />IN PLACE <br />NOT <br />WITHIN <br />SPEC. <br />AC -1 <br />24' S of Hwy 133B; 7' N of centerline <br />2 <br />1 <br />n/a <br />152.4 <br />n/a <br />143.2 <br />94.0 <br />AC -2 <br />41'S of Hwy 133B; ITS of centerline <br />2 <br />1 <br />n/a <br />152.4 <br />n/a <br />142.7 <br />93.4 <br />COMPACTION SPECIFICATIONS <br />OBSERVATION / TESTING <br />FIELD OBSERVATIONS <br />Required % of Marshall Unit Weight: <br />Full Time: <br />Part Time: <br />Number of Site Visits /Day: Q <br />Testing Only: <br />Requested By (Company Name): <br />Tribble & Sons Excavating <br />Date: 11/2912012 <br />Day: 5 <br />Weather: <br />Temp: <br />Wind: <br />Humidity: <br />Compaction Equipment Used: <br />Sheepsfoot: <br />Smooth Drum Roller: <br />Vibratory: �X <br />Other (List Below): <br />Required % of Theoretical Max Density: <br />92 -96 <br />M <br />T <br />W <br />Th <br />X <br />F <br />S <br />Required % of Voids: <br />ASPHALT CONCRETE SOURCE & MIX <br />Sun <br />Clear <br />X <br />Overcast <br />Rain <br />Snow <br />Supplier Type: United Companies, Inc. <br />Mix Type: Superpave grading "sx" with 20% RAP <br />75 gyration PG 64 -22F <br />To 32 <br />32 -50 <br />50 -70 <br />X <br />70 -85 <br />85 Up <br />still <br />X <br />Mod <br />High <br />Informed (Rep of Company) of Test Results: <br />Seth Tribble <br />Dry <br />X <br />Mod <br />Humid <br />Construction Activities: <br />Paving 50' ROW on south side of Hwy 1338 <br />Buckhorn was not informed prior <br />to our arrival on site that the <br />contractor would not be working <br />on this date. <br />Observer's Remarks: <br />Record No. <br />pg. 1 of 1 <br />12- 274 -CMT Bowie Mine Gob Pile Road.xls ANDTSI1- 29- 12jh #1 -sj <br />