Laserfiche WebLink
CG <br />CQA ACTIVITIES: <br />t) Field Activities: Construction activities and observation of production drilling, Cut, HWY 67 embankment fill <br />placement and compaction as -well as field sampling were performed during this reporting period as required per project <br />specifications. <br />II) Laboratory Activities: Laboratory testing continued with Permeability, Particle Size Distribution, Atterberg Limits, <br />Moisture - Density, gradations and material classification and identifications and material sampling were performed during <br />this reporting period as required. <br />General Proiect Items <br />Meetings and Discussions: Weekly Project Status meeting was held at 10:00am on July 2^d between CC &V, Ames and <br />Amec. Topics discussed were Safety, Schedule, Project Issues, concerns and planning. <br />Summary of Concerns: None <br />CC &V.• Daily updates, reporting and scheduling are some of the tasks occurring between CC &V Projects, Amec and Ames. <br />Miscellaneous: None <br />Deliveries: None <br />CQA Monitor <br />Submitted by: Thorne Clark Date: 07.06.13 <br />Thorne M Clark <br />Amec Project Resident <br />Ph: 970.846.9337 <br />Approved By: Ulf <br />Date: �- f -13 <br />Page 3 of 6 MLE2 WE 07.06.13.doc <br />