Laserfiche WebLink
C) Highway 67 <br />"Mil"l- emr�lk - <br />Fill continues to be placed and compacted by method specification. A GPS dozer was observed shaping the <br />western downstream slope of the embankment. (See Fill section above for more detail) <br />Iq Storm Water Management <br />Best Management Practices (BMP) are being performed. <br />C A ACTIVITIES: <br />n Field Activities: Observation of construction activities, production drilling, Cut, HWY 67 embankment fill placement and <br />compaction, clay removal as -well as field sampling were performed during this reporting period as required per project <br />specifications. <br />11) Laboratory Activities: Laboratory testing continued with Permeability, Particle Size Distribution, Atterberg Limits, <br />Moisture- Density, gradations and material classification and identifications and material sampling were performed during <br />this reporting period as required. <br />General Proiect Items <br />Meetings and Discussions: Weekly Project Status meeting was held at 10:00am on July 9"1 between CC &V, Ames, CDOT <br />and Amec. Topics discussed were Safety, Schedule, Project Issues, concerns and planning. <br />Summary of Concerns: None <br />CC &V. Daily updates, reporting and scheduling are some of the tasks occurring between CC &V Projects, Amec and Ames. <br />Miscellaneous: None <br />Deliveries: None <br />CQA Monitor <br />Submitted by: Thorne Clark Date: 07.13.13 <br />Thorne M Clark <br />Amec Project Resident <br />Ph: 970.846.9337 <br />Approved By: �0 'gUdk <br />ATTACHMENT A <br />Date:- <br />Page 3 of 6 MLE2 WE 07.13.13.doc <br />