Laserfiche WebLink
Parcel K-A-10 Point Post Mine Topo SL14 Map Sheet 2 Difference Ft. Aug-13 Correction Corrected Difference <br /> Elevation Ft. Elevation Ft. GPS Factor Elevation <br /> Transect 6 A 7298.00 7300.00 -2.00 7262.172 31.90 7294.07 -5.93 <br /> Transect 6 B 7347.00 7350.00 -3.00 7330.11 31.90 7362.01 12.01 <br /> Transect 6 C 7398.00 7400.00 -2.00 7361.4761 31.901 7393.38 -6.62 <br /> Transect 6 D 1 7448.00 7450.00 -2.001 7413.4331 31.90 7445.33 -4.67 <br /> Transect 6 E 1 7497.00 7500.00 -3.001 7466.1761 31.901 7498.08 -1.92 <br /> Post Mine Topography; Parcel K-A-10; Transect 6 <br /> 7550.00 <br /> 7500.00 <br /> w 7450.00 _..____ _.______ 4- •Hap IV112:Post Mining <br /> LL Topography, <br /> 0 7400.00 #SL14 Map Sheet 2 <br /> Y <br /> R <br /> µ, 7350.00 August Inspection Ele+.ation <br /> 7300.00 <br /> 7250.00 - <br /> A B C D E <br /> Page 6 of 12 <br />