Laserfiche WebLink
Parcel F-AB-09 Point Post Mine Topo SL14 Map Sheet 2 Difference Ft. Aug-13 Correction Corrected Difference <br /> Elevation Ft. Elevation Ft. GPS Factor Elevation <br /> Transect 2 A 7400.00 7403.00 -3.00 7343.165 31.90 7375.07 -27.94 <br /> Transect 2 B 7450.00 7448.00 2.00 7402.065 31.90 7433.97 -14.04 <br /> Transect 2 C 7500.00 7502.00 -2.00 7454.622 31.90 7486.52 -15.48 <br /> Transect 2 D 7550.00 7540.00 10.00 7503.333 31.90 7535.23 -4.77 <br /> Transect 2 E 7550.00 7550.00 0.00 7518.519 31.90 7550.42 0.42 <br /> Transect 2 G 7500.00 7500.00 0.00 7463.929 31.90 7495.83 -4.17 <br /> Post Mine Topography; Parcel F-AB-09; Transect 2 <br /> 7600.00 <br /> 7550.00 - - <br /> flap h9127 Post Mine <br /> LL 7500.00 - - - I Topography <br /> o_ -f-SL14 Nlap Sheet <br /> Y <br /> > 7450.00 <br /> GI <br /> W August Inspection Ele:ation <br /> 7400.00 - <br /> 7350.00 -- <br /> A B C D E G <br /> Page 3 of 12 <br />