2013-08-23_REPORT - M1980244 (3)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2013-08-23_REPORT - M1980244 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:24:09 PM
Creation date
8/27/2013 9:04:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
8/23/2013
Doc Name
Weekly CQA Reports- 7/20, 7/27, 8/3 and 8/10/2013.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L"Wilm"e, <br />An Amec field representative monitored structural fill material temperatures placed within the Hwy 67 embankment <br />during all shifts. Average structural fill temperatures were above 32 °F <br />Clay (SLF) Processing: <br />Cameron Site: No clay mining occurred during this reporting period due to a saturated site from previous rains. It <br />should be noted: Clay processing occurred and SLF sample No. 44 was obtained and returned to our Laboratory <br />for gradation analysis and permeability testing. <br />Squaw Gulch Site: <br />No work occurred at the VLF clay borrow site during this reporting period. <br />Underdrain System: <br />Secondary Underdrain: No work was performed on the Secondary underdrain during this reporting period. <br />A total of 1380 feet of Secondary underdrain has been completed. <br />Primary Underdrain: No work was performed on the Primary Underdrain during this reporting period. <br />A total of 1280 feet of Primary underdrain has been completed. <br />Temporary Underdrain: Temporary underdrain pipe is installed thru the embankment. No other work occurred <br />during this reporting period. <br />Underdrain Ponds: <br />Concrete for the underdrain Ponds are complete. No other work was performed. <br />Tree /Slash Clearing, Chipping: <br />Seed Masters resumed operations during this reporting period and is expected to continue chipping stockpiled trees and slash <br />within the VLF area. <br />B) Underground Workings <br />Confirmatory drilling was not performed during this reporting period. <br />During this reporting period exploratory excavation was performed on UG working No. 6239. Site listed continued <br />further investigation excavation into bedrock as remediation continues or completed during the reporting period as <br />specified. <br />Following a walk through of the planned Phase 2 Diversion ditch area, it was determined that approximately 21 <br />workings are located within the planned ditch and perimeter road. These sites are to be located and verified once <br />right -of -way and clearing of trees and brush are performed. <br />During this reporting period remediation efforts were performed and completed on UG working No.U6240, No. <br />6242, No. 6243, No. 6244, No. 6246, No. 6247, No, 6248, No. 6249 and No. 6250. Sites listed were excavated to <br />practical refusal into rock varying depths depending on the working remediated. The site for each working was then <br />backfilled in 2 foot loose lifts to approximate planned subgrade elevation using the onsite structural fill (excavated <br />material) and "bucket tamped" with the back of the CAT 330 excavator bucket. All backfill material was free of <br />organic material, ice and snow and are considered remediated as specified. <br />Q Highway 67 <br />Page 2 of 6 J LE2 WE 07.27.13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.