Laserfiche WebLink
Grade the channel where culvert C4 was removed to prevent the impoundment of water <br />4 Restore the berm at the "new water tank" SAE to its approved design <br />Clear vegetation, rocks and non -coal waste, and reshape and grade the following ditches as <br />necessary to restore them to the approved design: clean water diversion ditch above West Fan; <br />D29; D29B; D7; D9; D26 <br />6 Restore culvert C41 to its approved design, and backfill and grade around the inlet <br />7 Clear the upland diversion ditch above the RDA of fallen rocks and trees <br />Survey the entire length of the upland diversion ditch above the RDA to allow comparison of <br />constructed ditch with the approved design <br />TIME FOR ABATEMENT (NOT MORE THAN 90 DAYS): <br />ON OR BEFORE last abatement due date <br />Abatement Step # <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />Due, bate <br />September 16, 2013 <br />September 16, 2013 <br />September 16, 2013 <br />September 16, 2013 <br />September 30, 2013 <br />September 30, 2013 <br />September 30, 2013 <br />September 30, 2013 <br />