Laserfiche WebLink
Page 2 of 2 <br />S. With this application, no revisions to Volume XI Figure 1 have been proposed. Please revise <br />Volume XI, Figure 1 to include the location of the subdrainage system. <br />6. We have two additional comments regarding Volume XI, Figure 1 of the permit: <br />a. In comparing the cross section lines shown in the plan view with the sections drawn, it <br />appears that the letters need to be reversed on the map, i.e. D becomes D' and D' <br />becomes D. This switch also holds true for E -E' and F -F', as well. Please revise Volume <br />XI, Figure 1 to correct the orientation of the cross sections. <br />b. The cross sections show the original ground surface and the proposed ground surface. <br />It is the Division's understanding that excavation of topsoil and coverfill material was to <br />take place from within the footprint(s) of the pile(s). The limits of the excavation have <br />not been provided on this map, and should rightfully be incorporated. Please revise <br />Volume XI, Figure 1 to include the ground surface that will result when excavation is <br />complete and before gob material is placed in the pile. <br />If you have any questions or need additional information, please contact me. <br />Sincerely, <br />tea„ [1,0,,;x, <br />Susan L. Burgmaier <br />Environmental Protection Specialist <br />cc: Jim Stover, J.E. Stover & Associates <br />Marcia Talvitie, DRMS <br />