My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-08-13_REPORT - P2009023
DRMS
>
Day Forward
>
Report
>
Prospect
>
P2009023
>
2013-08-13_REPORT - P2009023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:23:45 PM
Creation date
8/23/2013 3:48:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2009023
IBM Index Class Name
REPORT
Doc Date
8/13/2013
Doc Name
ANNUAL FEE/REPORT
From
OPERATOR
To
DRMS
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 5 <br />13. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? YES NO <br />If "NO" please explain: <br />14. If exploration has exposed groundwater, is the site in compliance with the approved mining plan and Office of <br />State Engineer (Well Permit, S.W.S.P., and/or Permanent Augmentation Plan)? YES NO N/A <br />15. Are all hazardous materials stored within approved spill containment structures? YES NO <br />16. Does your NOI reclamation plan or Environmental Protection Plan require you to submit monitoring informatio '� <br />annually? YES NO C , <br />If "Yes ", please attach the required monitoring results to this Annual Report as required by Rule 1.15(1)(c). <br />17. As required by Rule 5.6(1)(g) submit with this report documentation to show that the Financial Warranty is still in <br />place and is adequate to fully reclaim the approved prospecting site disturbance(s). <br />/v ( ) <br />FINANCIAL WARRANTY DOCUMENTATION ATTACHED: � o ` k�` o 5 -6 <br />T <br />18. Please use the space below to describe as required by Rule 5.6(1)(c) any new prospecting activity that occurred during <br />the preceding year, including the locations and number of new surface drill holes, mud pits, excavations, rock dumps, <br />adits, shafts, trenches, pits, roads and structures. If applicable, you must also describe the measures taken to safeguard <br />shafts, adits and other mine openings from unauthorized entry both during and after prospecting. Additional pages <br />should be attached if needed. <br />7-h 0, C- vo k cj 50W yv\ je J� JQ�Olr <br />(/ (; 11c7 ►'1 v .n - � v�S T v R -�e c � n,- ) -e S. � GJR P l C..JA, <br />(,CA �) /A (J Q_ -kjqo�,n c� ^() L,,,/ - [ I ' /� A (- kt, <br />o v 4-kk i S Q. c <br />
The URL can be used to link to this page
Your browser does not support the video tag.